Poona Dam Case Study

Home » Case Studies » Poona Dam Case Study
envirosonic es300 unit installation at poona dam

Poona Dam, Caloundra QLD

This 500 metre circular potable water reservoir has a pontoon with two solar EnviroSonic ES300 units, on a 12 month trial to prove the effectiveness of EnviroSonic.